Loading

Overhaul Operations of Leg Sahar 1 under Extreme Conditions in Bandar Abbas

Project Objective

Overhaul Operations in Bandar Abbas

The overhaul operation of Leg Sahar 1, conducted under some of the most challenging climatic and industrial conditions in the country, was successfully completed. The project was carried out in temperatures exceeding 55°C, high humidity, and with numerous safety constraints, and it stands as a testament to the technical and operational capabilities of our holding.

  • Enhancing Equipment Resilience under Harsh Operational Conditions
  • Enhancing Employee Safety in Critical Industrial Processes
  • Successful Completion of the Project within the Scheduled Timeline

Team Preparation and Deployment

During the preparation phase, the project workshop was established, and all workshop systems and equipment were secured to provide a safe foundation for operations. Subsequently, the full deployment of personnel took place, with a 15-member team of specialized technicians from the holding entering the execution phase.

Category

Overhaul Operations

Location

Leg Sahar 1, Bandar Abbas

Date

2024

Operational Actions

In the operational phase, initial cleaning was carried out using an industrial water jet at 1000 bar pressure. Subsequently, the critical stage of executing wire brushing at a height of 120 meters was completed—a specialized task requiring extensive experience, physical capability, and engineering precision.

Project Results

Achievements and Results

Despite the challenging environmental conditions, our specialized team completed the project with full dedication and commitment, meeting the scheduled timeline and expected quality standards. This success once again demonstrated Dr. Ayagh Holding’s capability in executing heavy industrial projects under the toughest operational conditions in the country while adhering to the highest safety and quality standards.

Dr. Ayagh Holding (comprising Imen Balabran Kahkeshan International and Imen Balabran Kabir) has a team of 32 experienced rope access technicians at Levels 1, 2, and 3, ready to collaborate on projects in the oil, gas, and petrochemical industries, as well as in construction and civil engineering sectors.

Contact us

All rights reserved by Dr. Ayagh Holding © 2025